Boeing's Crew Capsule Launch Delays Extend into Summer 2024
Written on
Chapter 1: The Current State of NASA's Crew Program
As NASA's inventory of available seats on Russian Soyuz capsules dwindles, the long-awaited Commercial Crew Program is poised to become the primary method for transporting astronauts to the International Space Station (ISS). While SpaceX is set to launch its Dragon II capsule for crewed flights this summer, Boeing is reportedly lagging with its CST-100 Starliner, facing potential delays of several months.
"Initially, the goal of the Commercial Crew Program was to have US-based spacecraft operational several years ago. However, the complexities of constructing and testing a human-rated vehicle have proven to be significant hurdles."
Both SpaceX and Boeing successfully navigated through the design and prototyping stages and have been focused on preparing their crew capsules. Recently, SpaceX completed a successful crewed test of the Dragon II, which autonomously docked with the ISS, spent several days there, and then made a safe splashdown in the Atlantic Ocean. Boeing is now scheduled to conduct a similar unmanned test of the CST-100 next month, which has been pushed back from earlier timelines due to a fuel leak incident last year. Reports suggest that Boeing may require several more months before the Starliner can make its debut flight.
Section 1.1: CST-100 Starliner's Capacity and Challenges
The CST-100 Starliner is designed to transport up to seven astronauts to and from the ISS. However, insiders at Boeing have indicated to Reuters that multiple issues are causing these delays. Engineers are still addressing some technical challenges with the capsule, and scheduling conflicts at the Cape Canaveral Air Force Station have compounded the situation. While Boeing has remained tight-lipped about the specifics of the delay, NASA mentioned that an updated launch schedule will be released next week.
"Delaying the uncrewed Starliner launch into the summer could push back the timeline for the first crewed flight, which is currently scheduled for August."
Subsection 1.1.1: Implications of Delays
If the delays persist, the Starliner may not receive certification for crewed flights until November 2019. This would be a significant setback for Boeing, especially in light of the recent global grounding of the 737 Max 8 following two tragic crashes. However, industry experts suggest that a delay is preferable to launching a test flight that fails.
Now read: Boeing and SpaceX Might Not Be Ready for Manned Flights in 2019
Boeing 737 Crash Caused By New Safety System Pilots Weren’t Told Existed
Boeing May Be Funding Op-Ed Campaign Attacking SpaceX Across the Country
Chapter 2: Upcoming Events in the Commercial Crew Program
In this video, the NASA news conference discusses the preparations for Boeing's crew flight test, highlighting the importance of safety and readiness for upcoming missions.
This live stream captures the tense moments when Boeing's first astronaut flight was called off mere minutes before takeoff, raising questions about the program's future.